Services
A fully
integrated solution
Design-Build enables us to transform the client’s vision into a comprehensive, fully integrated solution, managing every stage of the project—from conceptual design and budgeting to detailed design, construction, commissioning, and building handover.
Traditional Method vs CCI D+B.
Traditional Method.
Design Build CCI.
Integrated solution
from the concept design stage.
CCI’s solution integrates design, planning, and economic evaluation from the preliminary design phase, enabling informed decision-making right from the start.
CCI’s solution combines the preliminary architectural design—already developed and approved by the client—with the construction schedule, financial investment flow, and a detailed budget including quality specifications into a single, comprehensive proposal.
The client gains access to all data relevant to their investment much faster and at a lower cost than under traditional methods, where such information typically becomes available only after the final design is completed and the bidding process is concluded.
CCI’s process enables rapid, agile iterations regarding the preliminary design and construction costs, drastically reducing the time required and aligning costs with investment requirements.
Integrating architectural and construction processes under a single point of responsibility allows for the incorporation of cost engineering, constructability, and financing criteria from the very beginning.
In an era focused on efficiency, synergies, and reliable results, delivery models such as Design-Build and IPD are gaining ground due to their effectiveness in reducing timelines and costs while enhancing quality.
Advantages.
A single contract and a single point of responsibility.
- Simplicity of relationships
- No conflict regarding the attribution of responsibility
Time savings.
- Early identification of available options.
- Shorter total project timeline due to greater efficiency compared to the traditional design-bid-build process.
- Early marketing of units during the pre-construction phase.
Fixed Price Based on Concept Design.
- Early knowledge of a fixed price.
- Enables project feasibility analysis.
- Reliable financing analysis, given the availability of a schedule and cash flow from the outset.
- Target-cost design.
Leveraging synergies.
- The relationship between designers and constructors results in lower costs and shorter delivery times.
Incorporation of construction improvements and value engineering.
- Our integrated role as both designer and builder allows us to continuously deliver innovative architectural and construction solutions.
Preventive rather than corrective approach.
Risk reduction.
Early visibility of the final investment cost reduces financing and opportunity costs, while preventing unnecessary sunk costs if the project is not financially feasible.
Flexibility.
- This methodology adapts to situations where the client already has a preliminary architectural design or even the detailed design documentation.